It can typically take anywhere from six to twelve months to build a new construction home, depending on the size and complexity of the project. There are many steps involved in the process, from designing and blueprinting to final inspections. In this article, we will outline each step of the process so you can have a better understanding of what is involved. We will also discuss some common timelines for each step so you can get an idea of how long the entire process will take.
Building Time According to The Home Type
The type of home you are building will play a big role in how long it takes to build.
Owner-built homes
Owner-built homes generally take longer to build than production homes built by home builders. This is because owner-builders often don’t have the same resources and expertise as professional home builders. It can take approximately 12 months.
Contractor-built
These homes usually take between seven and nine months to construct. This time frame can be affected by several factors, including weather delays, the availability of workers and materials, and the size and complexity of the home.
Custom Builds
A custom-built home takes longer to complete. Typically, customer builds are when the homebuyer works with the builder to design a floor plan from scratch. The contractor builds the house according to the needs of the customer, or rather according to what you want. Therefore, the duration of the construction of your home will depend on how much you customize your home. Generally, it takes anywhere from eight to ten months to construct a custom home.
Non-Custom Builds
A non-custom build is just like it sounds – the homeowner is not involved in the design or construction process.
The home is built using a set of predetermined specifications, with little to no customization. This type of build is also referred to as a production home, spec home, or tract home. Generally, it takes about four to six months to complete a non-custom build.
Steps of Building a Home
If you are wondering how long it takes to build a new construction home, the answer depends on several factors. If we assume that you have already acquired
land and have the necessary permits, construction typically falls into these steps:
1. Clearing and grading the land
This is usually done by an excavator and can take a few days to a couple of weeks.
2. Foundation
The next step is to pour the concrete foundation, and this can take anywhere from a day to a week.
3. Framing
After the foundation has cured, it’s time to frame the house. This involves putting up the studs and rafters. For a typical home, framing takes about three weeks.
4. Exterior finishes
Once the framing is complete, the exterior finishes are added. This includes siding, roofing, and windows. Depending on the size and complexity of the home, this can take anywhere from a few days to a couple of weeks.
5. Interior finishes
The last step is to add interior finishes, such as drywall, flooring, cabinets, and countertops. This usually takes a few weeks to months, depending on customizations and material availability.
On average, it takes about seven months to build a new construction home from start to finish. However, this can vary depending on the size and complexity of the home, as well as the weather and other factors. Be certain to do your research and understand what causes delays into finishing home construction projects so you don’t have unrealistic and unreasonable expectations from your builders.